PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding clips along the column at the North Elevation (2nd Floor) (800x600).jpg Continued installing duct work at the 1st Floor Facing North (800x600).jpg Electrical conduit at the 2nd Floor Facing West (600x800).jpg Electrical conduit at the 3rd Floor Facing West (600x800).jpg Fireproofing the 2nd Floor Facing West (800x600).jpg
Next page Welding clips along the column at the North Elevation (2nd Floor) (800x600)
Welding clips along the column at the North Elevation (2nd Floor) (800x600)